- Joined
- Mar 9, 2023
- Messages
- 3,270
Incident Location: 501 10th Avenue
Class 3 - Automatic Alarm - DHL Building.
TL21: Transmit The 10-75, Fire In The Electrical Room.
B9: Fire In The Electrical Room On The Ground Floor, (1) Precautionary Line Stretched. Notify ConEd To Respond.
B9: You Can Start Out The Purple K Unit (E33 w/ Purple K 33).
CIDS: 7-Story 200x200 Class 1 Irregular Commercial.
MD/B9: L4 Is Designated Your FAST Truck & Medical Branch Resources Are Responding.
B9: Using All Hands For Fire On The 1st Floor Of A 7-Story 200x200 FP Commercial. (2) Precautionary Line Stretched, Searches Are In Progress. (Duration 19 Min)
Exposures:
1: Street
2: Street
3: Street
4: 1-Story Taxpayer
D3: All Visible Fire Has Been Extinguished, It Was Knocked Down By The Sprinkler Head. Primary Searches On The 1st & 2nd Floor Are Complete & Negative, Secondary Searches Are In Progress. (Duration 31 Min)
D3: Secondary Searches On The 1st & 2nd Floor Are Complete & Negative, Units Are Venting. DWH. (Duration 46 Min)
D3: PWH. (Duration 1hr)
D3: Under Control. (Duration 1hr, 21 Min)
Rundown:
E34, E26, E54, E1
TL21, L24, L4F
B9, B7
R1
SQ18
D3
RAC1
E33 w/ Purple K 33
*E1 Initially Unavailable*
Relocations:
L10 act. L24
Class 3 - Automatic Alarm - DHL Building.
TL21: Transmit The 10-75, Fire In The Electrical Room.
B9: Fire In The Electrical Room On The Ground Floor, (1) Precautionary Line Stretched. Notify ConEd To Respond.
B9: You Can Start Out The Purple K Unit (E33 w/ Purple K 33).
CIDS: 7-Story 200x200 Class 1 Irregular Commercial.
MD/B9: L4 Is Designated Your FAST Truck & Medical Branch Resources Are Responding.
B9: Using All Hands For Fire On The 1st Floor Of A 7-Story 200x200 FP Commercial. (2) Precautionary Line Stretched, Searches Are In Progress. (Duration 19 Min)
Exposures:
1: Street
2: Street
3: Street
4: 1-Story Taxpayer
D3: All Visible Fire Has Been Extinguished, It Was Knocked Down By The Sprinkler Head. Primary Searches On The 1st & 2nd Floor Are Complete & Negative, Secondary Searches Are In Progress. (Duration 31 Min)
D3: Secondary Searches On The 1st & 2nd Floor Are Complete & Negative, Units Are Venting. DWH. (Duration 46 Min)
D3: PWH. (Duration 1hr)
D3: Under Control. (Duration 1hr, 21 Min)
Rundown:
E34, E26, E54, E1
TL21, L24, L4F
B9, B7
R1
SQ18
D3
RAC1
E33 w/ Purple K 33
*E1 Initially Unavailable*
Relocations:
L10 act. L24
Last edited: