Bellaire, Queens, NY, 10/31/08
Address: 218-60 110 Ave between Springfield Ave and 221 St
Phone Box 5436 - Report of a structural fire @ 218-67 110 Ave
Engs. 301, 304, 317
L150, TL162
Battalion 54
10-75-5436 - 08:47 hours
E275
L165 is the FAST truck
Battalion 50
Rescue 4
Squad 270
Division 13
7-5-5436 - 08:49 hours
Battalion 54: Extra engine and truck, we have a 2 1/2 story peaked roof PD fully involved, All-Hands on arrival
E251, L133 S/C
RAC4
08:53 hours
BC54: We've got a 2 story PD, peaked roof, we got 3 lines in operation, trucks are opening up and the fire is Doubtful
Fire Building Height/Size-up:
25x45 2 1/2 story PD w/ peaked roof
Exposures are:
1 - street
2 - side yard
3 - side yard
4 - side yard
08:54 hours
BC54: Have the special called engine and truck respond to the fire building when they arrive
08:55 hours
Command Tactical Unit is responding
08:55 hours - Duration 12 minutes
BC54: Companies are making excellent progress at this time
08:57 hours - Duration 14 minutes
BC54: Main body of fire has been knocked down on the 1st and 2nd floor, searches are underway, fire is still Doubtful
08:58 hours
BC54: Primary search throughout the structure are complete and negative, still Doubtul will Hold.
Command Tactical Unit is 10-8
08:58 hours
Division 13 is 10-84
08:59 hours
BC54: The correct address is 218-60 110 st. Have Con Ed respond to this box, we have primary wires in jeapordy and we need power shut off to this structure.
09:00 hours - Duration 17 minutes
BC54: Box 5436, Probably Will Hold
09:05 hours
DC13: Box 5436, you can 10-2 rescue, make this a 10-41 code 1 (Suspicious fire in occupied structure), mixer off.
09:15 hours - Duration 32 minutes
DC13: Fire is under control. Releasing Squad 270, E251, and Battalion 50
09:29 hours - Duration 46 minutes
DC13: Secondaries throughout are complete and negative, Division 13 is 10-8, Battalion 54 is Incident Commander.
Address: 218-60 110 Ave between Springfield Ave and 221 St
Phone Box 5436 - Report of a structural fire @ 218-67 110 Ave
Engs. 301, 304, 317
L150, TL162
Battalion 54
10-75-5436 - 08:47 hours
E275
L165 is the FAST truck
Battalion 50
Rescue 4
Squad 270
Division 13
7-5-5436 - 08:49 hours
Battalion 54: Extra engine and truck, we have a 2 1/2 story peaked roof PD fully involved, All-Hands on arrival
E251, L133 S/C
RAC4
08:53 hours
BC54: We've got a 2 story PD, peaked roof, we got 3 lines in operation, trucks are opening up and the fire is Doubtful
Fire Building Height/Size-up:
25x45 2 1/2 story PD w/ peaked roof
Exposures are:
1 - street
2 - side yard
3 - side yard
4 - side yard
08:54 hours
BC54: Have the special called engine and truck respond to the fire building when they arrive
08:55 hours
Command Tactical Unit is responding
08:55 hours - Duration 12 minutes
BC54: Companies are making excellent progress at this time
08:57 hours - Duration 14 minutes
BC54: Main body of fire has been knocked down on the 1st and 2nd floor, searches are underway, fire is still Doubtful
08:58 hours
BC54: Primary search throughout the structure are complete and negative, still Doubtul will Hold.
Command Tactical Unit is 10-8
08:58 hours
Division 13 is 10-84
08:59 hours
BC54: The correct address is 218-60 110 st. Have Con Ed respond to this box, we have primary wires in jeapordy and we need power shut off to this structure.
09:00 hours - Duration 17 minutes
BC54: Box 5436, Probably Will Hold
09:05 hours
DC13: Box 5436, you can 10-2 rescue, make this a 10-41 code 1 (Suspicious fire in occupied structure), mixer off.
09:15 hours - Duration 32 minutes
DC13: Fire is under control. Releasing Squad 270, E251, and Battalion 50
09:29 hours - Duration 46 minutes
DC13: Secondaries throughout are complete and negative, Division 13 is 10-8, Battalion 54 is Incident Commander.