- Joined
- Dec 20, 2006
- Messages
- 1,469
Brooklyn, N. Y. 04/26/07 @ 17:45 hrs.
Bedford / Stuyvesant Section
Box 925
address: 400 Herkimer St.
between: Kingston Ave. & Albany Ave.
925 @ 17:42
Engs. 214, 235, 234
T. Lad. 111, Lad. 123
Batt. 57
Rescue Co. #2 is assigned
10 ? 75 ? 925 @ 17:48
Ladder 132 is designated as the ?FAST? Truck
Eng. 217
Squad Co. #252
Batt. 38
Division 15
Fire Building:
7 Story Brick 235 x 120 O. M. D.
No Exposures
All ? Hands:
7 ? 5 ? 925 @ 17:50
Batt. 57 reports: At Box 925, We have a fire on the 3rd. floor of a 7 story brick
occupied multiple dwelling. We have 1 ? line stretched and in operation. Truck?s
are ?Opening Up? At this time, We?re using All ? Hands.
@ 17:51
Batt. 57: Box 925, Main body of fire has been knocked down.
Primary searches are still underway.
@ 17:53
Division 15: Box 925, We have 1 ? line stretched and in operation.
2nd. line is being stretched. Searches are still in progress.
@ 17:56
Division 15: At Box 925, Primary searches on the 3rd; 4th; 5th; & 6th. floors are complete
and negative. Secondary searches are being conducted.
@ 17:58
Division 15: At Box 925, Probably Will Hold at this time.
@ 18:03
Division 15: At Box 925, Secondary searches on the fire floor and on the floors above
are all negative. Fire?s UnderControl.
Bedford / Stuyvesant Section
Box 925
address: 400 Herkimer St.
between: Kingston Ave. & Albany Ave.
925 @ 17:42
Engs. 214, 235, 234
T. Lad. 111, Lad. 123
Batt. 57
Rescue Co. #2 is assigned
10 ? 75 ? 925 @ 17:48
Ladder 132 is designated as the ?FAST? Truck
Eng. 217
Squad Co. #252
Batt. 38
Division 15
Fire Building:
7 Story Brick 235 x 120 O. M. D.
No Exposures
All ? Hands:
7 ? 5 ? 925 @ 17:50
Batt. 57 reports: At Box 925, We have a fire on the 3rd. floor of a 7 story brick
occupied multiple dwelling. We have 1 ? line stretched and in operation. Truck?s
are ?Opening Up? At this time, We?re using All ? Hands.
@ 17:51
Batt. 57: Box 925, Main body of fire has been knocked down.
Primary searches are still underway.
@ 17:53
Division 15: Box 925, We have 1 ? line stretched and in operation.
2nd. line is being stretched. Searches are still in progress.
@ 17:56
Division 15: At Box 925, Primary searches on the 3rd; 4th; 5th; & 6th. floors are complete
and negative. Secondary searches are being conducted.
@ 17:58
Division 15: At Box 925, Probably Will Hold at this time.
@ 18:03
Division 15: At Box 925, Secondary searches on the fire floor and on the floors above
are all negative. Fire?s UnderControl.