Signal73 Joined Jan 20, 2014 Messages 21,060 Oct 12, 2024 #1 Fire Location: 48-52 208 St L-160 gave the 10-75 Fire in the basement of a PD L-152 Fast B-53 All Hands E-306,320,326,299,313 L-167,160,152(Fast),164 B-53,52 R-4 Sq-288 D-14 Rac-4 Last edited: Oct 12, 2024
Fire Location: 48-52 208 St L-160 gave the 10-75 Fire in the basement of a PD L-152 Fast B-53 All Hands E-306,320,326,299,313 L-167,160,152(Fast),164 B-53,52 R-4 Sq-288 D-14 Rac-4
8 8060rock Joined Feb 9, 2018 Messages 4,855 Oct 12, 2024 #2 Box loaded up due to calls B53: 2 L/S - 1 L/O D14: UC (duration 42 min.) E305 act. E299 L154 act. L167 E317 act. E306 E297 act. E313
Box loaded up due to calls B53: 2 L/S - 1 L/O D14: UC (duration 42 min.) E305 act. E299 L154 act. L167 E317 act. E306 E297 act. E313
F FDNYSTATENISLAND Joined Apr 13, 2012 Messages 10,006 Oct 12, 2024 #3 The 53 has had a busy few weeks especially 160 and 164 Trucks