Signal73 Joined Jan 20, 2014 Messages 18,995 Today at 10:41 AM #1 Fire Location: 200 Penn Ave *Saint Charles School* Ruptured high pressure gas main B-23 10-80 Code 1 E-165,162,159,161 L-85,82,87(Fast) B-23,22 R-5 Sq-1 D-8 Rac-5 Sq-8 w/ 2nd Piece HM-1 HMB Last edited: Today at 10:50 AM
Fire Location: 200 Penn Ave *Saint Charles School* Ruptured high pressure gas main B-23 10-80 Code 1 E-165,162,159,161 L-85,82,87(Fast) B-23,22 R-5 Sq-1 D-8 Rac-5 Sq-8 w/ 2nd Piece HM-1 HMB
10-75 Da Box! Joined Mar 9, 2023 Messages 4,375 Today at 10:22 PM #2 Signal73 said: Fire Location: 200 Penn Ave *Saint Charles School* Ruptured high pressure gas main B-23 10-80 Code 1 E-165,162,159,161 L-85,82,87(Fast) B-23,22 R-5 Sq-1 D-8 Rac-5 Sq-8 w/ 2nd Piece HM-1 HMB Click to expand... L081 Normally 3rd Due (FAST) & BC21 Normally 2nd Due, Both Unavailable (Box 8742). E152T ST05 Assigned On The AH. Phone Alarm Reporting A Contractor Struck A Gas Line - 10:15. E165: Confirmed Contractor Struck A High Pressure Gas Main - 10:24. B23: 10-75, School Has Been Evacuated - 10:34. B23: National Grid Has Mitigated The Leak, PWH - 10:42. B23: Using All Hands - 10:45. B23: Under Control, Return Any Units Not 10-84 - 10:46 (Duration 31 Min). Relocations: E318 act. E162 E202 act. Q008 T149 act. T087 T161 act. T085
Signal73 said: Fire Location: 200 Penn Ave *Saint Charles School* Ruptured high pressure gas main B-23 10-80 Code 1 E-165,162,159,161 L-85,82,87(Fast) B-23,22 R-5 Sq-1 D-8 Rac-5 Sq-8 w/ 2nd Piece HM-1 HMB Click to expand... L081 Normally 3rd Due (FAST) & BC21 Normally 2nd Due, Both Unavailable (Box 8742). E152T ST05 Assigned On The AH. Phone Alarm Reporting A Contractor Struck A Gas Line - 10:15. E165: Confirmed Contractor Struck A High Pressure Gas Main - 10:24. B23: 10-75, School Has Been Evacuated - 10:34. B23: National Grid Has Mitigated The Leak, PWH - 10:42. B23: Using All Hands - 10:45. B23: Under Control, Return Any Units Not 10-84 - 10:46 (Duration 31 Min). Relocations: E318 act. E162 E202 act. Q008 T149 act. T087 T161 act. T085