Chelsea, Manhattan, NY, 12/24/09
Address: 464 W14 st between Washington St and 10th Ave
Phone Box 548 - Report of fire in a building under construction
Squad 18, Engs. 3, 14
TL12, L3
Battalion 2
10-75-548 - 11:59 hours
E24
L24 (FAST Truck)
Battalion 7
Rescue 1
Squad 1
Division 1
7-5-548 - 12:05 hours
Battalion 2: We have a 3 story fireproof commercial building, fire on the 1st floor, appears to be a propane tank, using All-Hands.
RAC1
12:08 hours
BC2: We have a 3 story fireproof commercial building, fire on the 1st floor. We have 2 lines stretched, 1 in operation, trucks are opening up, all searches are negative as of right now, just the primary.
Exposures are:
1 - street
2 - 3 story similar
3 - unknown
4 - 12 story building under construction
12:15 hours
BC2: We have what appears to be a propane tank burning on the 1st floor. Members are cooling down the tank right now, we're going to request HazMat to our location. Primaries on the 2nd floor are negative, primaries on the fire floor are still ongoing.
E44 (HazTec), HazMat 1, HazMat Battalion S/C
12:20 hours - Duration 24 minutes
Division 1: At this box we'll go Probably Will Hold. All primaries are negative throughout the building. It was a 200 lb acetylene tank that was burning. I'll get back to you with the dimensions of the building, we do need Buildings Dept. to respond.
12:21 hours
Rescue Battalion and Dept. of Buildings are responding.
Fire Building Height/Size-up:
3 story 50x100 commercial fireproof
12:25 hours
E33 is 10-8 in E3's response area
12:40 hours
Rescue Battalion is 10-8
12:47 hours - Duration 51 minutes
DC1: Box 548, all secondary searches are negative, we'll go Under Control at this time
Address: 464 W14 st between Washington St and 10th Ave
Phone Box 548 - Report of fire in a building under construction
Squad 18, Engs. 3, 14
TL12, L3
Battalion 2
10-75-548 - 11:59 hours
E24
L24 (FAST Truck)
Battalion 7
Rescue 1
Squad 1
Division 1
7-5-548 - 12:05 hours
Battalion 2: We have a 3 story fireproof commercial building, fire on the 1st floor, appears to be a propane tank, using All-Hands.
RAC1
12:08 hours
BC2: We have a 3 story fireproof commercial building, fire on the 1st floor. We have 2 lines stretched, 1 in operation, trucks are opening up, all searches are negative as of right now, just the primary.
Exposures are:
1 - street
2 - 3 story similar
3 - unknown
4 - 12 story building under construction
12:15 hours
BC2: We have what appears to be a propane tank burning on the 1st floor. Members are cooling down the tank right now, we're going to request HazMat to our location. Primaries on the 2nd floor are negative, primaries on the fire floor are still ongoing.
E44 (HazTec), HazMat 1, HazMat Battalion S/C
12:20 hours - Duration 24 minutes
Division 1: At this box we'll go Probably Will Hold. All primaries are negative throughout the building. It was a 200 lb acetylene tank that was burning. I'll get back to you with the dimensions of the building, we do need Buildings Dept. to respond.
12:21 hours
Rescue Battalion and Dept. of Buildings are responding.
Fire Building Height/Size-up:
3 story 50x100 commercial fireproof
12:25 hours
E33 is 10-8 in E3's response area
12:40 hours
Rescue Battalion is 10-8
12:47 hours - Duration 51 minutes
DC1: Box 548, all secondary searches are negative, we'll go Under Control at this time