Signal73 Joined Jan 20, 2014 Messages 18,526 Mar 22, 2023 #1 Fire Location: 50-16 64th St R-4 gave the 10-75 Fire in a PD E-292,Sq-288,325,259 L-163,136,128(Fast) B-46,45 R-4 Sq-252 D-14 Rac-2 B-46 All Hands Last edited: Mar 22, 2023
Fire Location: 50-16 64th St R-4 gave the 10-75 Fire in a PD E-292,Sq-288,325,259 L-163,136,128(Fast) B-46,45 R-4 Sq-252 D-14 Rac-2 B-46 All Hands
D dg116 Joined Mar 18, 2009 Messages 688 Mar 22, 2023 #2 Replace 287 with 259 Hazmat trio was also added for an ebike fire. Last edited: Mar 22, 2023
8 8060rock Joined Feb 9, 2018 Messages 4,040 Mar 22, 2023 #3 Box loaded up due to calls - E259 & S252 added QD: now have report of people trapped 2nd floor R4: fire 2nd floor of PD B46: 1 L/S/O B46: (3) 10-45 No Codes D14: (3) 10-45 Code 3 D14: (1) 10-45 Code 4 D14: UC (duration 26 min.) L173 act. L136 E326 act. E292 L129 act. L128 E289 act. E259 Last edited: Mar 22, 2023
Box loaded up due to calls - E259 & S252 added QD: now have report of people trapped 2nd floor R4: fire 2nd floor of PD B46: 1 L/S/O B46: (3) 10-45 No Codes D14: (3) 10-45 Code 3 D14: (1) 10-45 Code 4 D14: UC (duration 26 min.) L173 act. L136 E326 act. E292 L129 act. L128 E289 act. E259