Address: 390 E. 153 St.
Report of fire 3rd floor
6 story 100'x60' Class 3 MD
Maybe,
S41, E60, 71, 73, 50
L55, 29, 19F, 17
B14, 26
S61
R3
D6
RAC3
HMB, HM1, E44 HazTech Unit
Other Boxes out in area affected response
B14 gave 10-75, fire 3rd floor - we need HazMat for e-bike
B14 gave All Hands - 1 Line being stretched
L19F
B14: 2 L/S, 1 L/O
D6: UC (duration 1 hr. 12 min.)
E43 act. E50
E88 act. E60
S288 act. S61
L61 act. L42
B45 act. B14
Report of fire 3rd floor
6 story 100'x60' Class 3 MD
Maybe,
S41, E60, 71, 73, 50
L55, 29, 19F, 17
B14, 26
S61
R3
D6
RAC3
HMB, HM1, E44 HazTech Unit
Other Boxes out in area affected response
B14 gave 10-75, fire 3rd floor - we need HazMat for e-bike
B14 gave All Hands - 1 Line being stretched
L19F
B14: 2 L/S, 1 L/O
D6: UC (duration 1 hr. 12 min.)
E43 act. E50
E88 act. E60
S288 act. S61
L61 act. L42
B45 act. B14
Last edited: