Address: 568 West 149 Street - at Broadway

Fire on the 3rd floor of a 6 story 75x75 MD.

0806 - Bn. 16 - Transmit the 10-75.

L-28 FAST

0809 - Bn. 16 - All Hands - Give me an extra Truck (L-30).

0812 - Bn. 16 - Fire on the 3rd floor. 2 L/S, 1 L/O. Primaries are in progress. Trucks are opening up.

0814 - Div. 6 - Give me a 2nd Alarm.

0815 - Bn. 16 - 2 L/S/O. We have extension to the 4th floor.

0824 - Div. 6 - I need 2 additional Truck Companies (TL-13 act. L-30, TL-17).

0827 - Div. 6 - 3 L/S, 2 L/O, water on the fire. Primaries are underway. We have (1) 10-45 code 4.

0833 - Div. 6 - Primaries are negative in the fire apartment, Apt. 3B.

0846 - Div. 6 - Primaries and secondaries are complete and negative on the floor above in Apt. 4B.

0855 - FC - Per Div. 6 - Secondaries are negative throughout. PWH - Duration 53 minutes.

0920 - FC - Under Control - Duration 1 hour 19 minutes.

Maybe:
E-80, 84, 69, 67, 37
L-23, 34, 28F, 40, 30 s/c
B-16, 13
S-41
R-3
D-6
RAC-3

2nd Alarm Maybe:
E-59, 93, 60
L-13 act. 30, 17
B-14, 12 RUL, 17 Safety
SB, RB, FC, Tac 1
E-72 w/ Sat. 2

Relocations:
E-48 act. E-67
E-26 act. E-37
E-92 act. E-60
TL-13 act. L-30
L-154 act. H&L-34
L-11act. L-30
B-52 act. B-16
 
Last edited: