- Joined
- Jan 20, 2014
- Messages
- 18,005
Location: 605 West 30th St
Worker 30 Feet Down a hole at a construction site.
E-34,26,54
E-44 w/ 2nd Piece
L-21,24
L-7(Soc Support)
L-25 w/ R.C 1
B-7
R-1,4
Sq-18 w/ 2nd Piece
Sq-1 w/ 2nd Piece
D-1
RB,SB
FC
Tac-1
CTU
HM-1
HMB
Soc Compressor
Soc Logistics
ReBreather-1
K9
Car-1(Fire Commissioner)
*Milestone 18,000+ Post*
Worker 30 Feet Down a hole at a construction site.
E-34,26,54
E-44 w/ 2nd Piece
L-21,24
L-7(Soc Support)
L-25 w/ R.C 1
B-7
R-1,4
Sq-18 w/ 2nd Piece
Sq-1 w/ 2nd Piece
D-1
RB,SB
FC
Tac-1
CTU
HM-1
HMB
Soc Compressor
Soc Logistics
ReBreather-1
K9
Car-1(Fire Commissioner)
*Milestone 18,000+ Post*
Last edited: