14 story 110'x115 Class 1 NYCHA MD
SB2 covering Div 3,6,7,1414 story 110'x115 Class 1 NYCHA MD
Maybe,
E53, 91, 58, 22
E44 HRN
E35 CFRD
L43, 26, 13F
L22, 14
E39 w/HR2
B10, 11, 12, 16S
S41
R1
D3
FC, SB, RB, RM
RAC1
E22/L13 initially unavailable
B10 gave 10-75, fire out the windows 5th floor
L13F
B10 gave All Hands, we need EMS
B10: make it a 10-77
D3: (1) 10-45 Code 3
D3: UC (duration 34 min.)
L25 act. L26
L42 act. L43
L12 act. L22
E16 act. E22
TL22 OOS, Medicals. L40 Was Assigned.14 story 110'x115 Class 1 NYCHA MD
Maybe,
E53, 91, 58, 22
E44 HRN
E35 CFRD
L43, 26, 13F
L22, 14
E39 w/HR2
B10, 11, 12, 16S
S41
R1
D3
FC, SB2, RB, RM
RAC1
E22/L13 initially unavailable
B10 gave 10-75, fire out the windows 5th floor
L13F
B10 gave All Hands, we need EMS
B10: make it a 10-77
D3: (1) 10-45 Code 3
D3: UC (duration 34 min.)
L25 act. L26 (sent back after being in L26 area)
L115 act. L26
L42 act. L43
L12 act. L22
E16 act. E22
B2 act. B11
B18 act. B10
22 was thereTL22 OOS, Medicals. L40 Was Assigned.