- Joined
- Apr 13, 2012
- Messages
- 9,587
2366 Bedford Avenue
Fire in basement of a 6-story building under construction
Reporting a building fire
TL157 being waved in
BC41: 10-75, fire in subcellar of a building under construction
L174 FAST
BC41: We need a priority response from Electric, it’s the electric service going into the building in the subcellar
BC41: Using All-Hands. 2LS, 1LO. Primaries are being conducted. Water on the fire, can I have an extra truck for searches (L132, E240)
BC41: PWH, 15-minute duration. Primaries are negative throughout.
Probably:
E248, E255, E281, E249, E240
T157, L147, L174F, L132
R2, SQ01
BC41, 48
DIV15
Fire in basement of a 6-story building under construction
Reporting a building fire
TL157 being waved in
BC41: 10-75, fire in subcellar of a building under construction
L174 FAST
BC41: We need a priority response from Electric, it’s the electric service going into the building in the subcellar
BC41: Using All-Hands. 2LS, 1LO. Primaries are being conducted. Water on the fire, can I have an extra truck for searches (L132, E240)
BC41: PWH, 15-minute duration. Primaries are negative throughout.
Probably:
E248, E255, E281, E249, E240
T157, L147, L174F, L132
R2, SQ01
BC41, 48
DIV15
Last edited: