7/23/11 Manhattan Box 560 - All Hands

Joined
Nov 27, 2007
Messages
1,906
Chelsea, Manhattan, NY, 7/23/11

Address: 419 West 14 st @ 9th Ave

12:30 hours
Phone Box 560 - Report of fire from the roof
E3, Squad 18, E14
TL12, L24
Battalion 6


12:31 hours
Box loaded up on multiple calls
E24
Rescue 1


Report of workers on the roof trying to put the fire out

10-75-560 - 12:32 hours
Battalion 6 to Manhattan, URGENT, 560, 10-75.  We have those workers on the roof, 419 West 14 st, go with that address
T5 (FAST Truck)
Battalion 2
Division 1
Squad 1


12:33 hours
BC6: Fire's on the 4th floor of a 419 West 14 st.

7-5-560 - 12:34 hours - Duration 7 minutes
BC6: 4 story 100x200 class 2 building, we have fire on the top floor, fire in the cockloft, we need an extra engine and truck.  All-Hands.
E1, L3 S/C
RAC1

12:36 hours
BC6: We've got water on the fire, fire's being knocked down, searches underway.

12:36 hours - Duration 10 minutes
BC6: Using All-Hands, Doubtful.

12:37 hours - Duration 11 minutes

12:39 hours - Duration 12 minutes
BC6: Primary search on the top floor is negative, k.

12:40 hours
Command Tactical Unit is responding

12:43 hours - Duration 16 minutes
Division 1: Box 560, we've got a fire on the roof with slight communication to the top floor, 2 lines stretched, 1 in operation, trucks in the process of overhauling, primary searches are negative

12:45 hours - Duration 18 minutes
DC1: On Box 560, we'll go with a Probably Will Hold, you can turn back Squad 1.

12:56 hours - Duration 30 minutes
DC1: We are Under Control, secondaries are complete and negative on the top floor.

Exposures are:
1 - street
2 - 3-story attached commercial
3 - unknown
4 - 4-story attached commercial​
 
As a matter of interest how long would it take for Sq 1 to get to Chelsea from Brooklyn??
 
16 mins if you take the tunnel

16-17 mins if you take the brooklyn bridge  depending on which way you go when you get off the bridge

responding to a 10-75 id say 10-15
 
Back
Top