@1326: 75-1841: Batt. 39 operating with all hands for a fire at 2668 Pitkin Avenue, near Chestnut Street, East New York Section of Brooklyn. Fire in a 2 story PD.
Normal Assignment: Engines 236, 225, 332 Ladders 107, 175 Batt. 39
Squad 252, Rescue 2, Batt. 44, Div. 15
@1332: Batt. 39: primary search of first and second floors is negative, fire is probably will hold. Fire duration is 13 minutes.
Ladder 124 relocated to Ladder 107.
@1346: Div. 15: secondary searches on the fire floor are negative, fire is under control. Fire duration is 28 minutes.
@1350: Engine 248 acting Engine 225 is 10-8.
@1357: Engine 234 acting Engine 332 is 10-8.
Normal Assignment: Engines 236, 225, 332 Ladders 107, 175 Batt. 39
Squad 252, Rescue 2, Batt. 44, Div. 15
@1332: Batt. 39: primary search of first and second floors is negative, fire is probably will hold. Fire duration is 13 minutes.
Ladder 124 relocated to Ladder 107.
@1346: Div. 15: secondary searches on the fire floor are negative, fire is under control. Fire duration is 28 minutes.
@1350: Engine 248 acting Engine 225 is 10-8.
@1357: Engine 234 acting Engine 332 is 10-8.