Signal73 Joined Jan 20, 2014 Messages 18,404 Yesterday at 9:33 AM #1 Fire Location: 246 West 18th St Fire in the duct work B-7 All Hands Under Control E-3,1,26 L-12,24 B-7 D-1 Last edited: Yesterday at 10:26 AM
Fire Location: 246 West 18th St Fire in the duct work B-7 All Hands Under Control E-3,1,26 L-12,24 B-7 D-1
8 8060rock Joined Feb 9, 2018 Messages 4,024 Yesterday at 10:49 AM #2 Signal73 said: Thats what I thought but im being told 12 & 24 Originally was 12 & 5 Click to expand... You're right, box came in prior to 0900
Signal73 said: Thats what I thought but im being told 12 & 24 Originally was 12 & 5 Click to expand... You're right, box came in prior to 0900
8 8060rock Joined Feb 9, 2018 Messages 4,024 Yesterday at 10:59 AM #3 Signal73 said: Fire Location: 246 West 18th St Fire in the duct work B-7 All Hands Under Control E-3,1,26 L-12,24 B-7 D-1 Click to expand... E14, L3 unavailable - Box 493 B7: using 2 Engines & 2 Trucks for slight haze at construction site - 1 precautionary line stretched B7 gave All Hands/UC - 1 L/S/O - small duct fire in rear of address Last edited: Yesterday at 11:05 AM
Signal73 said: Fire Location: 246 West 18th St Fire in the duct work B-7 All Hands Under Control E-3,1,26 L-12,24 B-7 D-1 Click to expand... E14, L3 unavailable - Box 493 B7: using 2 Engines & 2 Trucks for slight haze at construction site - 1 precautionary line stretched B7 gave All Hands/UC - 1 L/S/O - small duct fire in rear of address