J
JuniorBuff88
Guest
Date: 2/2/2008
Time:0040
Location: 80 Mayden Lane
Frequency: 154.2500
Units Operating:
Description Of Incident: Fire on 9th Floor of Commercial High Rise
Additional Units on 10-76:
L1 Fast, E3, E33, L6, L8, B4 10-75 Chief, Div 1, B32, B31 Safety, Rac 1, High Rise 1, TSU 1, Safety Batt, Rescue Batt, Fieldcom, E8 Lobby Control Unit, E55 CFR Engine
0105: Div 1 reports 2 LS, 1LO, Searches in Progress, Sprinklers activated, still DWH.
0115: Div 1 reports the Primary and Secondary Searches on Fire Floor and Floor above are complete and negative, Trucks still opening up, PWH.
(emtbravo.com)
Time:0040
Location: 80 Mayden Lane
Frequency: 154.2500
Units Operating:
Description Of Incident: Fire on 9th Floor of Commercial High Rise
Additional Units on 10-76:
L1 Fast, E3, E33, L6, L8, B4 10-75 Chief, Div 1, B32, B31 Safety, Rac 1, High Rise 1, TSU 1, Safety Batt, Rescue Batt, Fieldcom, E8 Lobby Control Unit, E55 CFR Engine
0105: Div 1 reports 2 LS, 1LO, Searches in Progress, Sprinklers activated, still DWH.
0115: Div 1 reports the Primary and Secondary Searches on Fire Floor and Floor above are complete and negative, Trucks still opening up, PWH.
(emtbravo.com)