10/2/2021 Brooklyn All Hands Box 1864

Joined
Oct 17, 2013
Messages
6,054
Address: 638 Hemlock Street - between Belmont and Sutter Avenue

Fire on the 2nd floor of a 2 story 20x60 PD.

1420 - TL-107 - Give a 10-75.

TL-142 FAST

1422 - Bn. 39 - All Hands - Heavy smoke and fire out the windows of the 2nd floor of a 2 story PD. (Engine 290, Engine 225, & Ladder 103 in the area and assigned.)

1426 - Bn. 39 - Primaries are negative in the basement and 1st floor. Trucks are opening up.

1429 - Bn. 39 - AVFKD.

1440 - Div. 15 - Primaries are complete and negative throughout. All visible fire is extinguished. We still have a smoke condition and trucks are opening up. DWH

1442 - Div. 15 - We're releasing the Rescue. PWH - Duration 25 minutes.

1451 - Div. 15 - Searches are negative in exposure 4. Trucks are overhauling and secondaries are in progress in the fire building.

1458 - Div. 15 - Secondaries are negative except for the immediate fire area. We have elevated CO in exposures 4A & 4B and we're venting.

1504 - Div. 15 - CO levels have dropped to acceptable levels. Under Control - Duration 47 minutes.

Maybe:
E-236, 293, 332, 285, 225, 290
L-107, 175, 142F, 103
B-39, 44
S-252
R-2
D-15
RAC-2

Relocators:
E-235 act. E-290
E-276 act. E-236
E-311 act. E-285
TL-159 act. TL-107
L-132 act. L-103
 
Last edited:
293 1st due. 225 on EMS run, then became available…. arrived 3rd due.
293, 332, 225
Excellent job by all
 
Address: 638 Hemlock Street - between Belmont and Sutter Avenue

Fire on the 2nd floor of a 2 story 20x60 PD.

1420 - TL-107 - Give a 10-75.

TL-142 FAST

1422 - Bn. 39 - All Hands - Heavy smoke and fire out the windows of the 2nd floor of a 2 story PD. (Engine 290, Engine 225, & Ladder 103 in the area and assigned.)

1426 - Bn. 39 - Primaries are negative in the basement and 1st floor. Trucks are opening up.

1429 - Bn. 39 - AVFKD.

1440 - Div. 15 - Primaries are complete and negative throughout. All visible fire is extinguished. We still have a smoke condition and trucks are opening up. DWH

1442 - Div. 15 - We're releasing the Rescue. PWH - Duration 25 minutes.

1451 - Div. 15 - Searches are negative in exposure 4. Trucks are overhauling and secondaries are in progress in the fire building.

1458 - Div. 15 - Secondaries are negative except for the immediate fire area. We have elevated CO in exposures 4A & 4B and we're venting.

1504 - Div. 15 - CO levels have dropped to acceptable levels. Under Control - Duration 47 minutes.

Maybe:
E-236, 293, 332, 285, 225, 290
L-107, 175, 142F, 103
B-39, 44
S-252
R-2
D-15
RAC-2

Relocators:
E-235 act. E-290
E-276 act. E-236
E-311 act. E-285
TL-159 act. TL-107
L-132 act. L-103
Right in middle of 236 & 225 for 1st due.
 
Address: 638 Hemlock Street - between Belmont and Sutter Avenue

Fire on the 2nd floor of a 2 story 20x60 PD.

1420 - TL-107 - Give a 10-75.

TL-142 FAST

1422 - Bn. 39 - All Hands - Heavy smoke and fire out the windows of the 2nd floor of a 2 story PD. (Engine 290, Engine 225, & Ladder 103 in the area and assigned.)

1426 - Bn. 39 - Primaries are negative in the basement and 1st floor. Trucks are opening up.

1429 - Bn. 39 - AVFKD.

1440 - Div. 15 - Primaries are complete and negative throughout. All visible fire is extinguished. We still have a smoke condition and trucks are opening up. DWH

1442 - Div. 15 - We're releasing the Rescue. PWH - Duration 25 minutes.

1451 - Div. 15 - Searches are negative in exposure 4. Trucks are overhauling and secondaries are in progress in the fire building.

1458 - Div. 15 - Secondaries are negative except for the immediate fire area. We have elevated CO in exposures 4A & 4B and we're venting.

1504 - Div. 15 - CO levels have dropped to acceptable levels. Under Control - Duration 47 minutes.

Maybe:
E-236, 293, 332, 285, 225, 290
L-107, 175, 142F, 103
B-39, 44
S-252
R-2
D-15
RAC-2

Relocators:
E-235 act. E-290
E-276 act. E-236
E-311 act. E-285
TL-159 act. TL-107
L-132 act. L-103
332 / 175. Once a gaine
 
Back
Top