2/12/21 Bronx 10-75 Box 2558

Response was 4E/3T, probably dispatch policy due to B'ldg. - 8 story, 200'x200', no standpipe

Maybe,
E82,50,73,94
L31,19,43,48F
B26,3
S41
R3
D6
Rac3

B26 gave 10-75

E58 act. E50
L43 act. L42
 
This is a tough huge bldg. Long stretch.Lots of work there over the years. Rope stretch is highly recommended. Thats why min response is 4 and 3
 
Back
Top