3/20/24 Manhattan 10-77 Box 51

Joined
Jan 20, 2014
Messages
16,108
Fire Location: 125 Greenwich St

NYPD Aviation reporting a fire on the roof

B-1 gave the 10-77

Fire on the roof of a 72 story 120 X 75 Building under construction

E-10,7,6,4,202
E-55(H. R Nozzle)
E-24(C.F.R.D)
E-279(Comm)
E-3 w/ H.R 1
L-10,1,15(Fast)
L-8,20
B-1,2,4,32,6(Safety)
R-1
Sq-18
D-1
Rac-1
RB,SB
FC
RM-1


IMG_3456.jpegIMG_3457.jpeg
 
Last edited:
Joined
Feb 9, 2018
Messages
3,037
Fire Location: 125 Greenwich St

NYPD Aviation reporting a fire on the roof

B-1 gave the 10-77

Fire on the roof of a 72 story 120 X 75 Building under construction

E-10,4,6,7
E-55(H. R Nozzle)
E-24(C.F.R.D)
E-3 w/ H.R 1
L-10,15,1(Fast)
L-8,20
B-1,2,4,6(Safety)
R-1
Sq-18
D-1
Rac-1
RB,SB
FC
RM-1


View attachment 42853View attachment 42854
Mega Hi-Rise b'ldg.

B1: fire in HVAC system on the roof - 1 L/S

B1: 1 L/S/O

D1: UC (duration 45 min.)

E238 act. E10
L21 act. L1
E21 act. E4
E201 act. E279
E205 act. E24
L110 act. L8
 
Last edited:
Joined
Sep 4, 2016
Messages
172
I'm out 3 years, so it could have changed. The units on the those boxes were just sent to Manhattan via their assigned routes. It was up to the IC if he wanted them at the fire.
 
Top