3/4/2021 Brooklyn All Hands Box 3467

Joined
Oct 17, 2013
Messages
5,929
Address: 2444 83 Street - off Stillwell Avenue

Fire on the 2nd floor of a 2 1/2 story 20x40 PD.

1550 - Bn. 42 - Transmit the 10-75. Fire on the 1st floor. Extra Engine and Truck (E-250, TL-149). Make that the 2nd floor. (All Hands).

TL-153 FAST

1553 - Bn. 42 - Fire on the 2nd floor of a fully detached PD. 2 L/S/O, searches in progress.

1558 - Bn. 42 - Water on the fire. MBFKD. Primaries are negative on the top floor.

1559 - Bn. 42 - We have (1) 10-45 no code.

1609 - Div. 8 - Requesting an additional Truck (L-156).

1615 - Div. 8 - Secondaries are negative on the 1st and 2nd floor. The 10-45 is code 2. DWH

1634 - Div. 8 - PWH - Make this a 10-41 code 1. Duration 49 minutes.

1643 - Div. 8 - Under Control - Duration 59 minutes.

Maybe:
E-243, 330, 254, 276, 250 s/c
L-168, 172, 153F, 149 s/c, 156 s/c
B-42, 43
S-1
R-5
D-8
RAC-5
 
Last edited:
Joined
Jan 11, 2016
Messages
2,254
Address: 2444 83 Street - off Stillwell Avenue

Fire on the 2nd floor of a 2 1/2 story PD.

1550 - Bn. 42 - Transmit the 10-75. Fire on the 1st floor. Extra Engine and Truck (E-250, TL-149). Make that the 2nd floor. (All Hands).

TL-153 FAST

1553 - Bn. 42 - Fire on the 2nd floor of a fully detached PD. 2 L/S/O, searches in progress.

1558 - Bn. 42 - Water on the fire. MBFKD. Primaries are negative on the top floor.

1559 - Bn. 42 - We have (1) 10-45 no code.

1609 - Div. 8 - Requesting an additional Truck (L-156).

Maybe:
E-243, 330, 254, 276, 250 s/c
L-168, 172, 153F, 149 s/c, 156 s/c
B-42, 43
S-1
R-5
D-8
RAC-5
E253 still relocated to coney Island?
 
Joined
Jan 11, 2016
Messages
2,254
Yea they still are.
This box bout 2 blocks from them would of been 1st due. Don't know if you have the answer is 253 getting major renovations 1st n 2nd floors or getting apparatus floor done?
 
Joined
Jun 15, 2020
Messages
94
This box bout 2 blocks from them would of been 1st due. Don't know if you have the answer is 253 getting major renovations 1st n 2nd floors or getting apparatus floor done?
I actually passed their quarters today. Still major work going on the apparatus floor. They are completely renovating it.
 
Joined
May 19, 2016
Messages
120
I actually passed their quarters today. Still major work going on the apparatus floor. They are completely renovating it.
I just heard today the reason for the long construction time is that when the work was almost completed, they discovered an underground stream under quarters. Mitigating potential future problems increased the need for more time.
 
Joined
Jul 29, 2019
Messages
358
Underground stream on 86st! Never knew it. I pass by there every day myself and was wondering why they've been relocated so long. Thanks for the info.
 
Joined
Jan 11, 2016
Messages
2,254
Underground stream on 86st! Never knew it. I pass by there every day myself and was wondering why they've been relocated so long. Thanks for the info.
Right! Underground stream? crazy stuff under our city streets man.
 
Top