Signal73 said:
@18:53 B20 using All Hands for High CO Readings
L-56 requested a BN(BN-20) for high CO readings(1000 PPM)
BN-20 while responding requested the box be transmitted (box 3066 same building as the fire)
E-45,E-64,L-41
L-56 have units respond on a 10-20
BN-20 using 2&2 rest fast for High CO readings throughout the building
BN-20 requesting PD & FM's, while checking CO readings on the top fl a marijuana growing operation was
found.
BN-20 requesting D-7
18:37..BN-20, still using 2&2 rest fast, Co Levels dropping
BN-20, AH, no special units, requesting HazMat,HazMat-BN,SQ-61/HazTec for the drug lab
D-7 requesting a PD supervisor
18:57..D-7, PWH
19:12..D-7, releasing E-64,E-88,L-41, still PWH
19:23..D-7, UC, clear of chemicals strictly a cannabis growing operation